Scope:
Graham
Residential
McKinstry
CECO
DW Close
This project was a unique challenge, as it
provided numerous opportunities for our skills to be put to the
test. SRI was an intregal part in relocating 104 buck-outs, and
100+ cores. Many cores and buck-outs were in close proximity to
columns.
|

This picture has two 4" cores cutting through rebar
avoiding the post-tension cable in red |
|
|

With some critical areas being placed next to a
column, we were presented with unique set of difficulties to
overcome.
In this image is the stud rails, top steel
(black), banded and distributed cables (red), with two 4" and one 2" core in the midst.
|
|
|
SRI pays great attention to details, accurately
displaying what is in the
slab.
|
|
|
|
|

Cables are in red and plastic conduit along with j-boxes
are in orange
|

This is the underside of the same floor, with the
j-boxes reveled slightly in the concrete
|
|
|
These pictures show the benefit of
using SRI and ground penetrating radar (GPR). Their accuracy and
mobility are unbeatable. |
|
|
| |